Souadou5509 Souadou5509
  • 16-12-2022
  • Computers and Technology
contestada

If a defined project is determined to be feasible in the systems development life cycle (SDLC), the next step is to _____A. Create and test componentsB. Form the project team C. maintain the systemD. Asses process results

Respuesta :

Otras preguntas

How many legs do ladybugs have?
Find the value of W if A=LW, A=8m^2, and L=4m PLEASE HELP
A rain barrel is a right circular cylinder. If 1ft^3 =7.5 gallons, how many gallons of rainwater can the barrel hold? Use 3.14 Barrel is 1.35ft left to right..
when does an inciting incident occur in a plot?
Kelly carried a box weighing 10 N the 200 meters from his car to his new house.  George took the box from Kelly and carried it up the 3 meter tall flight of sta
Genetic engineering is used in the biotechnology industry to? (1) eliminate all infections in livestock (2) synthesize hormones such as insulin and human growt
A rain barrel is a right circular cylinder. If 1ft^3 =7.5 gallons, how many gallons of rainwater can the barrel hold? Use 3.14 Barrel is 1.35ft left to right..
what is the KE of a 1 kg ball traveling at 30 meters per second?
if a triangle has 3 side one is 12 one is 72 what is the last sude
G=H(q+Q)for Q Solve for Q I dont understand how to do this.