  • 18-01-2024
  • Engineering
contestada

After girders or beams are set in place, the first step in building the floor frame is to?
a. Install floor joists
b. Lay the subflooring
c. Install the floor insulation
d. Place the concrete foundation

Respuesta :

Otras preguntas

1.) why do scientist think Pluto is frozen all the way through 2.) what mission was sent to Pluto?
 I need help the answers that are there are SSS SAS ASA AAS HL and Not enough information
Both the Glorious Revolution and the English Bill of Rights supported the idea that
In which location of the digestive system will you find both physical AND chemical digestion?
algebra nation section 3- topic 8
Which ratios are I proportional relationships 2 to 3 and 4 to 6
Sun Inc. factors $6,000,000 of its accounts receivables without recourse for a finance charge of 5%. The finance company retains an amount equal to 10% of the a
use pascal's triangle to expand (2x+4)^4​
___?___ Rice Indigo Silk Tobacco This list represents the major products in colonial Georgia. What product should correctly be placed in the blank space? A) Co
28 + 3r = 10r Ye im to lazy to actually work it out