sssssaaaaaddddd4440 sssssaaaaaddddd4440
  • 18-01-2024
  • Computers and Technology
contestada

For a given program, Clock period x CPI (average clock Cycles Per Instruction) * IC (Instruction Count) = ?
A. Clock Period
B. Average Execution time of One Instruction
C. Instruction Count
D. Execution Time of the program

Respuesta :

Otras preguntas

A sled is at rest at the top of 2 m high slope. The sled has a mass of 45 kg. The sled's potential energy is
a line passes through the point -2 and five and has a slope of 2/3 points A(x,3) and B(-2,y)lie on the line
help 10 points! please My life depends on it.
Drag each tile to the correct box. In what order does the plot of a fictional story typically progress? A.climax B.denouement C.exposition D.rising action E.fal
In a certain​ country, the true probability of a baby being a boy boy is 0.524 0.524. among the next eight eight randomly selected births in the​ country, wh
Select all of the methods through which a drug can enter your body. injection. swallowing. inhalation. absorption.
Which disease attacks the body’s joints? Alzheimer's disease Parkinson's disease dementia arthritis
Myoglobin is particularly abundant in a) Nerves b) Muscles c) Blood cells d) Skin
describe the efficient role of transport in urban economy..
Which of the following powers does the president have