noahdavis4837 noahdavis4837
  • 17-04-2024
  • Business
contestada

Which one is a positive risk?
1) Saving cost of project
2) Implementation of new technology that leads to a reduction in the cost of engineering
3) Loss of reputation
4) Cost overrun in project
5) Inflation in Time Material contract
6) Improve performance

Respuesta :

Otras preguntas

How much money is 15% of $14.90 SHOW YOUR WORK
"Anger eats our own wisdom."explain this proverb ​
Plans Math Fourth grade > W.4 Parallel sides in quadrilaterals 58M How many pairs of opposite sides are parallel? no pairs 1 pair 2 pairs Submit​
On average, Delores takes about 4 more minutes to walk home than to bike home. We CANNOT express this value as a multiple of the measure of variation. This is t
Find the 9th term of the geometric sequence 3, -15, 75,
maize is called monocotyledon plant why​
plzzzz help me with this problem
in what number base is the addition 456+24+225=1050​
Which method is most successful at increasing discernment, the ability to differentiate fake news from real news, in media consumers? a. Presenting fact-check t
pls help me with 3,4, and 5