The five project process group actions are usually performed when?

Respuesta :

LearnGrow
LearnGrow LearnGrow
  • 26-06-2018
The five process groups include: Initiating, Planning, Executing, Monitoring and Controlling and Closing.
The five project process group actions are usually performed when a pre-specified product, service or result should be created (a project).
This group of processes provides guidelines and criteria for tailoring the organization's processes to the specific needs of the project.
Answer Link

Otras preguntas

How many cubic feet of gas will a rectangular gas tank hold if it measures 15 ft x 4 ft x 6 ft?
What indians desired most, upon encountering europeans, was?
In a right triangle the length of one leg is six units the length of the other leg is 8 units what is the length of the hypotenuse hint use the Pythagorean theo
List the measurements from smallest to largest 7 cm 18 mm 1 m 3 dm
Read this excerpt from President John F. Kennedy’s inaugural address on January 20, 1961: In the long history of the world, only a few generations have been gr
Before texas instruments was renamed in 1951, what was it called?
why might a very good raconteur make a poor auctioneer?
Figure ABCD is a parallelogram. What is the perimeter of ABCD? A. 14 units B. 38 units C. 44 units D. 49 units
Melanie sold half of her comic books and then bought 8 more. She now has 16. How many did she begin with?
Number eight please