chngkyn1
chngkyn1 chngkyn1
  • 20-12-2018
  • Mathematics
contestada

The graphic shows the schedule network diagram (in minutes) for assembling a toy train set. What is the duration of the critical path?

A) 38 minutes
B) 41 minutes
C) 49 minutes
D) 51 minutes

The graphic shows the schedule network diagram in minutes for assembling a toy train set What is the duration of the critical path A 38 minutes B 41 minutes C 4 class=

Respuesta :

chocolateandchildren chocolateandchildren
  • 26-12-2018
D because it is longer than the rest
Answer Link

Otras preguntas

Question 1 By general law, life and limb must be protected; yet often a limb must be amputated to save a life, but a life is never wisely given to save a limb
Tybalt kill mercutio true or false
why was the South Carolina colony founded????
What is it called when a seismic wave bounces backward when it reaches a boundary?
There 25 trees on Jackson property. Twenty percent of the trees are oak trees. Which equation can be used to find the number of oak trees on property?
Which of the following powers does the president have
The length of an object is measured as 85.9 centimeters. What is this measurement in scientific notation? A)8.59 × 101 centimeters B)859 × 101 centimeters C
What is a possible theme of “Everyday Use” ?
Find an equation of the plane. the plane through the point (4, −7, −7) and parallel to the plane 2x − y − z = 6
DO,K = (5, 0) (10, 0) The scale factor is 1/2 2 5