deneef1990 deneef1990
  • 19-02-2020
  • Mathematics
contestada

A construction crew has just finished building a road. The crew worked for 9 days. If they built 4 1/6 kilometers of road each day, what is the total length of road they built?

Respuesta :

masonmorales777 masonmorales777
  • 19-02-2020
if they worked nine days and built 4 1/6 km a day it’s just multiplying the numbers

answer: 37.5 km or 37 1/2
Answer Link

Otras preguntas

A lawn in the shape of the a trapezoid has an area of 1,833 square meters. The length of one base is 52 meters, and th length of the other base is 42 meters. Wh
describe the domain and range of f(x)= -square root of x+1
Can someone please answer. There is one problem. There's a picture. Thank you!
let f(x) = 4x 3 and g(x) = -2x 5. find (fog)(5)
the distance between a (-5, 3) and b(5, 3) is.
A lawn in the shape of the a trapezoid has an area of 1,833 square meters. The length of one base is 52 meters, and th length of the other base is 42 meters. Wh
Jack is making a rectangular flag in art class. He has created the main part of the flag, which measures 2 feet by 1 foot. He wants to use exactly 10 square fee
Convert 25 mg to unit HG
what was the effect of the gold standard act of 1900?
John Muir was known as a A. botanist B. naturalist C. poet D. Satirist