shorty8671yolo
shorty8671yolo shorty8671yolo
  • 19-03-2020
  • Mathematics
contestada

A TV production warehouse can assemble 120 TV’s in 4 hours. How long does it
take to make one TV? (Hint: Convert to Minutes)

Respuesta :

Ben
Ben Ben
  • 19-03-2020

[tex]\huge\boxed{2\ \text{minutes}}[/tex]

First, convert the number of hours to minutes.

[tex]4*60=240[/tex]

Now, divide by the number of TVs assembled in that time.

[tex]240\div 120=\boxed{2}[/tex]

Answer Link

Otras preguntas

what is a factor in math?
How do I solve this question
What is the area of this face
A piece of equipment moves 16.5 yards in 12 minutes. how many feet does it move per minute? round the answer to three decimal places
square root of 80 minus the square root of 5
Which of the following rests below a laptop and protects the computer from overheating and also your lap from excessive heat?
Questioning of the witness by the opponent of the party that called that witness is called____examination. cross critical didactic skeptical
Unequivocal means a. impervious to pacifying. b. clear, not confusing. c. lack of equality. d. kindly.
What conditions are required for a cloud to form in the atmosphere?
One complete revolution of earth around the sun takes about