A builder mixes one part of cement with four parts of sand to make mortar if he uses 100 pounds of sand how much is cement?

Respuesta :

gamercartel06
gamercartel06 gamercartel06
  • 19-09-2020

Answer:

25

Step-by-step explanation:

one part of 4 parts = 1/4

100 divided by 4 = 25

Answer Link

Otras preguntas

A bag contains 4 red marbles, 10 white, and 6 green. Once a marble is drawn it is not replaced. Determine the probability of drawing two marbles in the order sh
which emperor contructed a fortified wall across great britain?a. nerob.augustus ceasarc.hadriand.trajan​
Use the Distributive Property to rewrite 7(x + 14).
The growth/decay factor within the exponential equation y=4(5)x is
Vital body system begin to lose function as you age. Aging effects all of the body's cells, tissues, and organs which in turn affect the functioning of all body
Which of the following policies would not fit into the original democratic Republican Party platform?
In large cities such as New York City, a majority of citizens often take public transportation and leave their cars at home. What is wrong with this text and vi
Consider the energy diagram below. GO Free Energy Reaction Progression Which line indicates a higher reaction rate? Abecause it has a lower activation energy. B
What is the root of r^64 r^4 r^8 r^16 r^32
Members of the pep club were selling raffle tickets for $1.50 and $5. The number of $1.50 tickets sold was two less than four times the number of $5 tickets sol