cc72704 cc72704
  • 20-11-2020
  • Mathematics
contestada

A construction company can remove 3/4 tons of dirt from a construction site each hour. how long will it take them to remove 36 tons of dirt from the site? (Answer needs to be in simplest form)

Respuesta :

abdulgafaryusuf9
abdulgafaryusuf9 abdulgafaryusuf9
  • 20-11-2020

Answer:

48hours

Step-by-step explanation:

36÷(3/4)

36*(4/3)

144/3

48

Answer Link

Otras preguntas

Im stuck can someone explain this please
which is not a phase in the creation of a historical explanation
how to solve -4 - (-14) + (4- -6)=
Complete this statement 27a^2x^2+45a^2x+36a^2=9a^2()
temas de cada estrofa de la Oda a la patria de aribau?
Grammar tutorial: Ser and estar. Fill in the blanks with the correst missing words or phrases. 1. La fiesta de Mario *blank* a las nueve. 2. El señor Rivas *bl
Simplify using combining like terms: 2x + 4y - & +9y + 6
Tetra Co. uses the perpetual inventory system and a FIFO cost flow method. On January 1, the company purchased 2,000 units of inventory that cost $4.00 each. On
Patty has decided to redecorate her room with parallelograms. She finds a piece of fabric with a parallelogram design and makes a tapestry to hang on the wall.
How did a Tyrant got their power? Please answer as fast as possible :(