If 2 men and 3 boys can do a piece of work in 8 days, how long will 3 men and 4 boys take to do it?​

Respuesta :

LAASMITH7
LAASMITH7 LAASMITH7
  • 19-01-2021

Answer:

they would do it in 13 days

Answer Link

Otras preguntas

A segment has endpoints (14,-8) and (4, 12). What are the coordinates of its midpoint?
The slope of the line represents a quantity called density. If rise represents the y-axis and run represents the x-axis, what is the formula for density?
What types of problem could we run into, as a nation, if the Bill of Rights didn't exist?
Calculate the are of each figure
All of the data in a digital book (letters, punctuation, spaces, etc) are stored and processed in a computer as binary. Break down how this works (hint: Ascii)
Fourteen boys and 21 girls will be equally divided into groups. Find the greatest number of groups that can be created if no one is left out.
solve for y 7y-3y=8 plzzzz answer will give brainliest!!!!
sin x = 4/5, cos x = 2/5 find the value of tan x​
Which detail reveals that there was a lot of lightning during the storm?
Who were the first settlers in Virginia