faderogaorico36 faderogaorico36
  • 21-02-2021
  • Mathematics
contestada

8. Four Men working together can finish a house repair job in 12 days.
How many days will 6 men working at the same rate finish the same ja
9 Which of the​

Respuesta :

asmaNasr
asmaNasr asmaNasr
  • 21-02-2021

Step-by-step explanation:

if 4 men did the job in 12 days , then each of the 4 men worked for 12 days , which means they worked for 4*12=48 days , so the job takes 48 work days to complete. If all men work at the same rate, then these other 6 will complete the job in

[tex] \frac{48}{6} = 8 \frac{days}{man} [/tex]

Therefore, it’ll take the group of 6 men 8 days to complete the job.

Answer Link

Otras preguntas

What term best describes the spread of Judaism beyond Southwest Asia? A) the Exodus B) the Babylonian Captivity C) the Diaspora D) the Persian conquest
According to nature where should a person go to be alone answer
Which was the most significant result of vespuccis second voyage?
Who received the nobel prize for research that led to the development of the lobotomy procedure?
_____ is the final step in implementing strategy.
The use of half steps suggesting the movement from one key area to another is called
in order to prove that your cause and effect relationship exists, it is important to do what?
PLEASE HELPP A quadratic function and an exponential function are graphed below. How do the decay rates of the functions compare over the interval A The expon
any material that allows thermal energy to pass through easily is a?
If you are asked to introduce a speaker, why should you coordinate your remarks beforehand with those of the speaker?