A construction company needs to remove 18 tons of dirt from a construction site. They can remove 2/3 tons of dirt each hour. How long will take to remove the dirt? Write your answer in simplest form

Respuesta :

wegnerkolmp2741o
wegnerkolmp2741o wegnerkolmp2741o
  • 21-07-2021

Answer:

27 hours

Step-by-step explanation:

Take the amount of dirt and divide by the amount per hour

18 tons ÷ 2/3 ton per hour

Copy dot flip

18 * 3/2

Rewriting

18/2 * 3/1

9*3 = 27

27 hours

Answer Link

Otras preguntas

if you divide a 4 inch by 8 inch rectangle from corner to corner what new shapes would you get? are they congruent? why or why not ?
Need sentences on what to do in summer in spanish
what event prompted Henry to establish the church of england
Choose the most precise measurement? A. 8 mL B. 12 mL C.1 mL D. 0.05 mL
How do you label Time= energy • power
in an experiment, 2.54 grams of copper completely reacts with sulfur, producing 3.18 grams of copper(I). Determine the total mass of sulfur consumed. And write
what is 22.5 as a fraction in simplest form
which of the following about prokaryotic chromosomes is true? a. comprise at least two chromosomes b. are made of DNA wrapped tightly around histone proteins c
The underline word is worst. What is the degree of comparison of the underlined modifier? That was the worst movie I have ever seen. A. superlative B. c
The Rigveda was one of the four sacred texts of what religion?