inagreen2020 inagreen2020
  • 18-11-2021
  • Physics
contestada

A crane lifts a 10000 N load through a distance of 30mins in 40s calculate work done

Respuesta :

blackshades
blackshades blackshades
  • 18-11-2021

Given,

Force = 10,000 N

Distance = 30 m

Time = 40 s

Work done = force × distance

Work = 10,000 × 30

Work = 300,000 J

______

꧁✿ ᴿᴬᴵᴺᴮᴼᵂˢᴬᴸᵀ2222 ✬꧂

Answer Link

Otras preguntas

The point B (-2, 1) has been transformed to B' (-5, -3). The transformation is described as A T (-3,-4) B R x=2 C T (-3,-2) D D3
2 pts When using resting heart rate as a fitness management tool, after a workout one's heart rate should return to beats per minute (bpm) five minutes after ce
Which statement of the line is true? A it is three throughout the line B it is 1/3 throughout the line C The slope from point O to point A is 1/3 Times the slop
What is social problem? Define it.​
Can someone please help me thanks in advance!
The point-slope form of the equation of the line that passes through (-4,-3) and (12, 1) is y-1= 164–12). What is the standard form of the equation for this lin
Match the term in column 1 with the definition in column 2. Naturalized citizens ? Social relationships, particularly among people who are related by family con
What is the area for the circle?
Which option is an example of a simple sentence? • A. Because people have the right to vote, the democratic process iS successful. • B. Voting rights are the co
We play outside. It is transitive or intransitive verb?If it is transitive, which is object?​