10 man construct a building in 40 days . how long will it take 20 man to do this work ?

Respuesta :

matthewhoweicecream
matthewhoweicecream matthewhoweicecream
  • 19-02-2022

Answer:

20 days

Step-by-step explanation:

Answer Link

Otras preguntas

A constant force causes an object to accelerate at 4 m/s2. what is the acceleration of an object with twice the mass that experiences the same force?
Peter was influenced by James as he ministered in Antioch. True False
What's the plot of "The Volcano Of Fire The Fifth Adventure In The Kingdom Of Fantasy" by Geronimo Stilton
Why did Taft win the Republican nomination during the 1912 presidential race?
Which language style would be most appropriate for the given situation? online chat room formal language informal language technical language
The time period of emerging adulthood is more likely to be seen in which of the following countries?
How did imperialism increase the battlefield of the war
¿Cómo se cree que fueron formadas Las Islas Galápagos?
A braid was bought to put around a blanket that measures 23 inches by 24 inches, At $0.60 per yard how much was paid for the braid if it can only be purchased b
Which characteristic of prokaryotic organisms makes them different from eukaryotes? a. prokaryotes do not have organelles with membranes. b. prokaryotes do no