cakreclau7375 cakreclau7375
  • 19-07-2022
  • Business
contestada

The cost object(s) of the activity-based costing method is(are)?

Respuesta :

frankieferrara05 frankieferrara05
  • 19-07-2022

Answer: The production activities in the first stage and the unit of product in the second stage.

Explanation:

Answer Link

Otras preguntas

If there is a strong correlation between the variables a and b, a may cause b. True or false?
Jermaine is ordering a piece of glass in the shape of a trapezoid to create a patio table top. Each square foot of glass costs $25. The trapezoid has base lengt
1. Kevin’s October water bill listed two distinct meter readings. The previous reading was 7,428 ccf and the present reading is 7,513 ccf. How much water did Ke
How was the war on poverty connected with the civil rights movements
1. which is greater value 0.4 3/4 0.152. which is least value 2 and 2/3, 2.45, 2 and 2/53.which is the greater value 3.95, 3 and 5/6, 3 and 4/5 ANSWER THEM ALL
Amy has $26 to spend on school supplies. After buying a notebook for $3.50 and 8 pens of equal cost, she had $16.18 left. Write an equation representing the mon
What is the correct factorization of 5!?
Find the length of the base of the following pyramid, given the height of the pyramid is 221 meters and the angle of elevation of the base of the pyramid is 62°
what is the probability of flipping two coins and both landing on heads
A charged particle of 5.1 nC and another with 2.6 nC are separated by a distance of 5.5 m. What is the electric potential energy between the particles?