twingirls twingirls
  • 20-04-2017
  • Mathematics
contestada

crew a can tunnel through a mountain in 30 days. if crew B starts from the other side at the same time, the tunnel can be completed in 18 days. how long would it take crew B working alone?

Respuesta :

jaxonehenry jaxonehenry
  • 20-04-2017
39 days because 1/2 of 18 =9 and 9 plus 30 = 39
Answer Link

Otras preguntas

(6x) to the power of the second
A bakery sends 4 carton of rolls . Each carton contains 6 box's holding 12 rolls each. The store divides the rolls into 8 in each bag. How many bags of rolls ar
how many cups is in 48 fluid ounces?
While looking at a cell under a microscope, a scientist is able to see a biological molecule. This molecule is a nucleic acid with double strands and contains t
what is the answer to mad of two or more substances together in the same place but not chemically combined 7 letter word 1st letter M 4th letter F 7th letter E
what is 0.751 as a percentage?
When Mendel crossed purebred purple flowering plants (PP) with purebred white flowering plants (pp), what were the flower colors of the resulting offspring? 25
what is 0.751 as a percentage?
Why was the Articles of Confederation discarded?
what is x when inverse sin (sinx)=1/6