llee5223 llee5223
  • 20-11-2017
  • Business
contestada

What is a mutually exclusive project? how should managers rank mutually exclusive projects?

Respuesta :

meerkat18
meerkat18 meerkat18
  • 30-11-2017

An exclusively project relationship simply means that certain projects are mutually exclusive by accepting one investment while rejecting other investments present. This decision is usually made when all other projects are excluded from any kind of considerations. 

Answer Link

Otras preguntas

what is the pimps name in catcher in the rye
True or False: There is no object that can travel faster than the speed of light.
who is the president of Honolulu?????​
How did the first people arrive in Australia? A. People swam long distances B. People used land bridges and walked C. People arrived via airplane in 1955 D. Peo
Sam took a flight from Dubai to Qatar. He left Dubai at 4 pm local time. The flight duration was 1 hour. If Qatar is 2 hours ahead of Dubai, what was the local
What is a paragraph ? how many parts of paragraph ? Explain each part .​
Lena had 70 eggs but after that, she had gave 50 to her best friend. How much dose Lena have eggs now?
A 15kg dog jumps out of a 40 kg canoe. If the dog's velocity is 1.2 m/s, what is the velocity of the canoe
What distinguishes a representative democracy from a direct democracy?
Country GDP per capita for 2015 fin dollars) Angola 4,100 Georgia 3,800 Indonesia 3.350 South Korea 27.200 Sudan 2,090 Sweden 50,300 the table presents the GDP