Kaiman Kaiman
  • 17-01-2018
  • Physics
contestada

How much work is performed when a 42kg crate is lifted to a height of 2m?

Respuesta :

averagejoe2
averagejoe2 averagejoe2
  • 17-01-2018
84 kg if work is performed bc 42 x 2 is 84
Answer Link

Otras preguntas

Which of the following was NOT associated with the Great Awakening of the 1730s? A. established a new Christian sect called the Methodists B. included the fi
How to solve 12b^2-13b+3
an=an-1+6an-2 n>2 a0=3 a1=6
**NEEd Help??!! 1. Hank bought a $24,000 car when he graduated from college. His car will lose half of its value in 6.58 years. At what rate does Hank’s car dep
Simplified form of 10000x64
For her exercise today, Yolanda plans to both run and swim. Let r be the number of laps she runs and let s be the number of laps she swims. Each lap she run
Which type of validity applies to research results based on subjective qualities? concurrent validity face validity construct validity predictive validity
Which object reflects light with the longest wavelength? a yellow book a violet flower a blue paper a green leaf
what type of muscle is only found in one place in the body A cardiac muscle B ligament muscle C skeletal muscle D smooth muscle Help!!
How to rename multiple files at once with different names?