What conditions must exist for separate contracts to be viable?

Respuesta :

W0lf93
W0lf93 W0lf93
  • 30-01-2018
The owner must be an in house CM or construction engineer to administer the contracts. CM is established as an independent contractor. The CM is responsible to the owner to complete the project by the established substantial completion date and within the agreed budget. The CM must compensate the owner when the construction does not satisfy the established standards of performance for a project.
Answer Link

Otras preguntas

Write the slope-intercept form of the equation of each line given the slope and y-intercept. Slope =-10, y-intercept = -5
A naturally occurring concentration of one or more metallic minerals that can be extracted economically is a(n) ________. ore tailing reserve resource
What is the value of x
Problem 3 Solve this system of equations: y=x-4 y= 6x – 10 Use paper to help you with your thinking. Submit
Help please I will give brainlist
Given the measure of angle 8 is 130o. What is the value of x if the measure of angle 5 is (x - 40)? Number only (no words or variables)
1. Cognates are words in two different languages that come from the same origin. They are alike in ____ and ____
Someone solve this for me please
Answer of (2d-3)4 if d=3Answer of (2d-3)4 if d= 2​
How does most ocean water return to the ocean in the water cycle? A .Group of answer choices B .Through precipitation over the ocean C. By flowing through river