dommanigo10 dommanigo10
  • 17-07-2014
  • Physics
contestada

A crane does 62,500 joules of work to lift a boulder a distance of 25.0 meters. How much did the boulder weight

Respuesta :

AL2006
AL2006 AL2006
  • 17-07-2014
Work = (force) x (distance)

62,500 joules = (boulder's weight) x (25 meters)

Divide each side by (25 meters) :

Boulder's weight = (62,500 joules) / (25 meters) = 2,500 newtons

That's about 562 pounds.
Answer Link

Otras preguntas

is 17 feet bigger than 804 inches
discuss five factors that could hamper effective communication
Which of the following is not a characteristic of Puritanism? A.) predestination B.) faith C.) original sin D.) salvation through good deeds
What are the types of transformations in 8th grade Pre-Algebra?
Relaxation, as a result of stretching can _____. help you lose weight lower your blood sugar levels raise your blood sugar levels cause you to gain weight
Market, planned, and mixed are three basic types of _____. imperialism fascism economic systems political organizations
Nice Hook sentences to start off 5 paragraph essay. Topic is: "Describe a time that you did something brave and also describe a time that you did something fool
substitution y=× +5 2x-y=-2
Romantic poets generally believed that nature offered a purpose and meaning beyond its physical appearance. a. True b. False
In what way has JROTC changdfrom a 100 years ago