sssssimombbbbbb81911 sssssimombbbbbb81911
  • 18-03-2018
  • Chemistry
contestada

Using a mixture of water, sand, and chemicals under high pressure to free tightly held oil and natural gas is known as ____. 1 point

Respuesta :

lilaipo
lilaipo lilaipo
  • 27-03-2018
Using a mixture of water, sand, and chemicals under high pressure to free tightly held oil and natural gas is known as Fracking or Hydraulic Fracturing. 
Answer Link

Otras preguntas

The floor is a rectangle that is inches 30inches by `36` inches. What is the side length of the largest possible tile they could use?
A test tube of water at 60°C is placed in a beaker of water at room temperature and left for 15 minutes. The temperature of the water in the test tube decreases
An island is 4 kilometers due south of its closest point along a straight shoreline. A visitor is staying in a tent that is 14 kilometers east of that point. Th
What is the vertex of the quadratic function below? 10 9 y оф 7 -10 -8 -6 6 9 4 #4 3 S f -2 no 2 + 6 -9 10 00 X 10
A coffee shop begins the day with 75 bagels and sells an average of 10 bagels each hour. Function b models the bagel inventory, b(x) , x hours after opening. b(
PLEASE HELPPPPP WILL GIVE BRAINLIEST!!!!!
what is the plot, characterization, setting, Themes and the literary Devices of the novel The hollow godsend by B. B. Suleiman​
Nico is building a fence around a circular log that has a radius of 20 meters. Each linear meter of fencing costs $5. How much will the circular fence cost Nico
Significado de altar en en himno a mella
is 8/11 closer to 1/2 or 1?